Time heals all…


I’m continually amazed at how fast the forest changes and grows. While we usually lament this fast growth as we’re battling face slappers and vines, it’s a real boon when healing abandoned trails. We just need to help it along…

Back in 2009, we had a short problem area at Lakeshore, a section of trail at the bottom of a hollow with no drainage. Days after each rainfall, it still looked like this:

Backtracking up the trail, we flagged a reroute on some higher ground.

A couple day’s work later and we had 100 yards of old trail to reclaim. Dave and I began by running a tiller to break up the compacted soil. This is important because it lets rain penetrate and provides a great substrate for seeds and plants to get established. We also transplanted some small trees before duffing the trail with forest litter and branches. At the entrance, we transplanted a small pine sapling to camouflage the old trail and discourage anyone from re-opening the line.

16 months later, the entry to the old section looked like this:

That small pine tree in the center of the photo was planted directly in the old trail bed. You can see some of the logs and branches we used to duff the trail, but already the old trail was becoming a memory. Few riders took any notice of it at all.

Today, 3 years later, that area looks like this:

The pine tree we transplanted has grown to over 6 feet tall, and there are a number of tree saplings in the old trail that are nearing waist height.  It’s hard to remember that this was the muddy, rutted out trail in the first image:

 

Really the only clues that identify this as an old trail are the cut branch stubs on the tree trunks next to where the trail once passed. There’s a lot of garlic mustard and other invasive plants that are all over this woods, but also a lot of small maples, beech (I think), and other desireables who will hopefully win out over time.

At a recent trail day at Maybury we followed the same techniques to reclaim some old abandoned trail near a wetland.

Hopefully, this trail too will be lost to time over the next couple years.


  • Bosch USA TrailDay!

    Bosch USA TrailDay!

    Thank you so much to Bosch USA for joining us a 2nd year with a Trailwork crew! This generous group helped beautify Lakeshore Park’s Lost Loop by fixing some drainage and erosion control issues under the careful eye of the Trail Coordinators, Dave Cox, Loren Konkus, and Dave Hurst. Thank you for your community involvement…

  • MCMBA Singletrack Slam, April 10 – Sept 30

    MCMBA Singletrack Slam, April 10 – Sept 30

    A challenge to ride all 14 trail systems of the MCMBA! If you like riding bikes, meeting new people, challenging yourself, spending time outdoors, trying new trails, and participating in non-race biking events, then check out the registration page for more info and to sign up today! Click here to view the trail completion tracker and…

  • Milford Trail Day w/ Trek – 5/16

    Milford Trail Day w/ Trek – 5/16

    Meetup Location:  Milford Mountain Bike Trailhead – 160 Peters Rd, Milford, MI 48381 Date and Time: Saturday May 16th @ 9:00 AM – Plan for a full day of trail work! What to Bring: Snacks will be provided! We’ll also coordinate with the Trail Coordinators to bring additional tools. Come ready to work hard, get a little dirty,…