Lakeshore Park Overview


Lakeshore Park

Novi’s Lakeshore Park mountain bike trail consists of 10.5 miles of singletrack that traverses a variety of terrain to satisfy both novice and experienced riders. Technical trail features, such as rock gardens, log piles, skinnies, and a pump track can be found alongside the trail throughout the system. In addition to the mountain bike trail, Lakeshore Park also features an extensive network of wider trails suited to walking, family biking, and cross-country skiing. The trail head and information kiosk is located at the south end of Lakeshore Park (601 South Lake Drive). Note that motorized vehicles are not permitted anywhere on park property.

  Lakeshore Park mountain biking trails

Trail Status:

Trail Miles: 10.5

MMBA Trail Discussion Forum: Link

Trail Coordinators:
Dave Cox, Loren Konkus

Trail Maps: Map-LakeshorePark.pdf

Local Weather: Weather Underground

Directions: From I-96, take exit 162 [Novi Road]. Head north on Novi road for 4 traffic lights [1.6 miles]. Turn left onto Old Novi Rd. At the stop sign turn left onto South Lake Shore Drive. Proceed down South Lake Shore Drive for .4 miles, and the entrance to Lakeshore Park is on the left after a small hill.

{google_map}601 South Lake Drive, Novi, MI|version:new|height:400|width:400{/google_map}

 


  • Another great Tree Farm Relay!

    Another great Tree Farm Relay!

    Thanks to everyone who came out yesterday and made the Relay such a success! The Relay race provides a significant part of our chapter’s income each year, and make it possible for us to invest in better trails throughout the year. Results are posted at http://newtontiming.com. A desktop or laptop will work best for viewing.…

  • A resolution to declare July 2015 as Tree Farm Relay Month.

    A resolution to declare July 2015 as Tree Farm Relay Month.

    Whereas, the Motor City Mountain Biking Association and Team Tree Farm will be hosting the 10th annual Tree Farm Relay benefit race in July; and Whereas, mountain bike benefit races are one of the primary funding sources for the chapter and we’re spending a mountain of cash on signs, kiosks, and other trail projects this…

  • Hines Park Sign Project

    Hines Park Sign Project

    For some months now we’ve been working with Wayne County Parks on a comprehensive trail marking system for the new Hines Park trails, including wayfinding signs installed on posts at intersections and decision points. The decals arrived, and they look awesome. Our thanks to DL Graphics for design work, Michael Flack for working with WCP…