FAQ Trailbuilding


Trail design, development, and maintenance are key components of the MCMBA and mountain biking in Michigan.  Our trail design volunteers are trained by IMBA using standards developed by the National Park Service and National Forest Service.


  • Lakeshore Park Overview

    Lakeshore Park Overview

    Lakeshore Park Novi’s Lakeshore Park mountain bike trail consists of 10.5 miles of singletrack that traverses a variety of terrain to satisfy both novice and experienced riders. Technical trail features, such as rock gardens, log piles, skinnies, and a pump track can be found alongside the trail throughout the system. In addition to the mountain…

  • Rouge Park

    Rouge Park

    Rouge Park The Rouge Park Trail is a beginner to intermediate singletrack trail in the City of Detroit’s Rouge Park in the Warrendale neighborhood. Close to Dearborn, Redford, Hines Drive, the Rouge Gateway Trail, Eliza Howell Park, and more.  The singletrack is short but has plenty of character and challenge. It basically travels along the…

  • Section 21 Trails at Settlers Park

    Section 21 Trails at Settlers Park

    Section 21 Trails at Settlers Park Loop 1 can be accessed from the Meijer trailhead or in a two-way connector from Loop 2.  It is a beginner/ family friendly loop of 2 miles in length.  It contains many optional technical features and is marked with brown arrows.   Loop 2 can be accessed from the paved…