Time heals all…


I’m continually amazed at how fast the forest changes and grows. While we usually lament this fast growth as we’re battling face slappers and vines, it’s a real boon when healing abandoned trails. We just need to help it along…

Back in 2009, we had a short problem area at Lakeshore, a section of trail at the bottom of a hollow with no drainage. Days after each rainfall, it still looked like this:

Backtracking up the trail, we flagged a reroute on some higher ground.

A couple day’s work later and we had 100 yards of old trail to reclaim. Dave and I began by running a tiller to break up the compacted soil. This is important because it lets rain penetrate and provides a great substrate for seeds and plants to get established. We also transplanted some small trees before duffing the trail with forest litter and branches. At the entrance, we transplanted a small pine sapling to camouflage the old trail and discourage anyone from re-opening the line.

16 months later, the entry to the old section looked like this:

That small pine tree in the center of the photo was planted directly in the old trail bed. You can see some of the logs and branches we used to duff the trail, but already the old trail was becoming a memory. Few riders took any notice of it at all.

Today, 3 years later, that area looks like this:

The pine tree we transplanted has grown to over 6 feet tall, and there are a number of tree saplings in the old trail that are nearing waist height.  It’s hard to remember that this was the muddy, rutted out trail in the first image:

 

Really the only clues that identify this as an old trail are the cut branch stubs on the tree trunks next to where the trail once passed. There’s a lot of garlic mustard and other invasive plants that are all over this woods, but also a lot of small maples, beech (I think), and other desireables who will hopefully win out over time.

At a recent trail day at Maybury we followed the same techniques to reclaim some old abandoned trail near a wetland.

Hopefully, this trail too will be lost to time over the next couple years.


  • Milford Trail Challenge

    Milford Trail Challenge

      12th Annual Milford Bike Festival Saturday, June 3rd, 2017 Join us in “Celebrating a Michigan Cycling Destination”. The event is a family friendly celebration of the great trails surrounding scenic Milford.   Explore the connectivity of our trail network from Milford. Enjoy several singletrack trails and paved paths with minimal road riding.  Not sure…

  • New Hines Park project

    New Hines Park project

    Wayne County Parks and MCMBA have signed a Memorandum of Understanding allowing us to develop mountain bike trails in Hines Park. Hines Parkway is a contiguous park of varying widths along Hines Drive and the Middle Rouge River from Northville to Dearborn Heights. Along this parkway is a heavily used paved recreational pathway of approximately…

  • Detroit Bike City Expo

    Detroit Bike City Expo

    A day to celebrate everything that is bicycles. Saturday March 29th come down to Cobo Center and be ready to have your eyes opened. Detroit Bike City is the largest consumer based bike expo around. Not only can you see whats coming out, but you can actually buy one off the floor. Old or new,…