Settlers Park Trail Map

Section 21 Trails at Settlers Park


Section 21 Trails at Settlers Park

Loop 1 can be accessed from the Meijer trailhead or in a two-way connector from Loop 2.  It is a beginner/ family friendly loop of 2 miles in length.  It contains many optional technical features and is marked with brown arrows.  

Loop 2 can be accessed from the paved path in several places or from Loop 1.  It is a beginner/intermediate loop with more technical features and beautiful views.  It is marked with blue arrows. Loops can be ridden consecutively or ridden alone.  

Loop 3 can be accessed from the Loop 2 trailhead or by an access point just north of the Township Hall parking lot on Clark Road. Over 1.6 miles in length, it features flowy downhills, berms, rock features and tight twisty uphills. Very different from the open woods of Loop 1 and the meadows of Loop 2, Loop 3 is thick with vegetation. This loop is marked with gold arrows.

Park contains bathrooms with flush toilets, a pavilion and a playground, as well as paved biking path that connects the Township Hall to Meijer and Hartland High School. Ample parking available just north of township hall and at the Meijer lot.  Both loops are frequented by hikers and trail runners, so please yield.   

Trail Status: open

Trail Miles: 6.5

Entry Fees: None

Trail Conditions and Discussion Forum: Link

Trail Coordinators: Tom Hermann, Marc Cope

Trail Maps: JPG, GPX (Click 3 dots, select Download)

 

Find this trail on MTB Project

 


  • Another great Tree Farm Relay!

    Another great Tree Farm Relay!

    Thanks to everyone who came out yesterday and made the Relay such a success! The Relay race provides a significant part of our chapter’s income each year, and make it possible for us to invest in better trails throughout the year. Results are posted at http://newtontiming.com. A desktop or laptop will work best for viewing.…

  • A resolution to declare July 2015 as Tree Farm Relay Month.

    A resolution to declare July 2015 as Tree Farm Relay Month.

    Whereas, the Motor City Mountain Biking Association and Team Tree Farm will be hosting the 10th annual Tree Farm Relay benefit race in July; and Whereas, mountain bike benefit races are one of the primary funding sources for the chapter and we’re spending a mountain of cash on signs, kiosks, and other trail projects this…

  • Hines Park Sign Project

    Hines Park Sign Project

    For some months now we’ve been working with Wayne County Parks on a comprehensive trail marking system for the new Hines Park trails, including wayfinding signs installed on posts at intersections and decision points. The decals arrived, and they look awesome. Our thanks to DL Graphics for design work, Michael Flack for working with WCP…