Chapter Meeting


Please join us at our next Chapter Meeting, Sunday Sept 10th at 7 pm

http://draftingtablebeer.com/home/home/

There’s a pre-meeting ride at 3!

Meet at Drafting Table and take the paved path to and from ILRA. This will be a long one, approximately 35 miles. 3:00 should give us enough time to complete the route and clean up in time for the September chapter meeting at Drafting Table.

 


  • Section 21 Trails at Settlers Park

    Section 21 Trails at Settlers Park

    Section 21 Trails at Settlers Park Loop 1 can be accessed from the Meijer trailhead or in a two-way connector from Loop 2.  It is a beginner/ family friendly loop of 2 miles in length.  It contains many optional technical features and is marked with brown arrows.   Loop 2 can be accessed from the paved…

  • Kensington Metro Park Connector Overview

    Kensington Metro Park Connector Overview

    Kensington to Proud Lake Connector The Kensington to Proud Lake Connector trail is a short segment of sweet singletrack that connects the paved biking path network at the east entrance of Kensington Metropark to Proud Lake Recreation Area. Hikers and bikers share this trail, while equestrians have a dedicated connector trail. Using the Kensington to…

  • Milford Trail

    Milford Trail

    Milford Trail Rolling and technical, the Milford Trail is a non-stop undulating roller coaster ride of 6 miles with spectacularly rewarding views. It is a great trail for honing your skills with uninhibited lung filling fun. The deepest, smallest capillaries of your circulatory system will be opened up as you pedal from hill to hill.…