Settlers Park Trail Map

Section 21 Trails at Settlers Park


Section 21 Trails at Settlers Park

Loop 1 can be accessed from the Meijer trailhead or in a two-way connector from Loop 2.  It is a beginner/ family friendly loop of 2 miles in length.  It contains many optional technical features and is marked with brown arrows.  

Loop 2 can be accessed from the paved path in several places or from Loop 1.  It is a beginner/intermediate loop with more technical features and beautiful views.  It is marked with blue arrows. Loops can be ridden consecutively or ridden alone.  

Loop 3 can be accessed from the Loop 2 trailhead or by an access point just north of the Township Hall parking lot on Clark Road. Over 1.6 miles in length, it features flowy downhills, berms, rock features and tight twisty uphills. Very different from the open woods of Loop 1 and the meadows of Loop 2, Loop 3 is thick with vegetation. This loop is marked with gold arrows.

Park contains bathrooms with flush toilets, a pavilion and a playground, as well as paved biking path that connects the Township Hall to Meijer and Hartland High School. Ample parking available just north of township hall and at the Meijer lot.  Both loops are frequented by hikers and trail runners, so please yield.   

Trail Status: open

Trail Miles: 6.5

Entry Fees: None

Trail Conditions and Discussion Forum: Link

Trail Coordinators: Tom Hermann, Marc Cope

Trail Maps: JPG, GPX (Click 3 dots, select Download)

 

Find this trail on MTB Project

 


  • Detroit Bike City

    Detroit Bike City

    It was great to see everyone at  http://www.detroitbikecity.org/ !  There was a lot to see at the show this year, and we signed up some new members!   See you next year?

  • Next chapter meeting

    Next chapter meeting

    Please join us for our first MCMBA chapter meeting of 2013. We’ve got a lot to talk about – trail day planning, 2013 races and events, Detroit Bike City, and some cool special initiatives. Also, we’re pleased to host a special guest for this meeting: Andy Williamson, our IMBA Director for the Great Lakes region.…

  • Donate a Plank!

    Donate a Plank!

    Long ago in an age shrouded by the fog of time, someone had an inspirational vision to help fund the development of some new bridges at Lakeshore Park with a “Buy a plank” program. For a small donation, a bridge plank was inscribed with the donors name. Today, every rider at Lakeshore still rides over…