Settlers Park Trail Map

Section 21 Trails at Settlers Park


Section 21 Trails at Settlers Park

Loop 1 can be accessed from the Meijer trailhead or in a two-way connector from Loop 2.  It is a beginner/ family friendly loop of 2 miles in length.  It contains many optional technical features and is marked with brown arrows.  

Loop 2 can be accessed from the paved path in several places or from Loop 1.  It is a beginner/intermediate loop with more technical features and beautiful views.  It is marked with blue arrows. Loops can be ridden consecutively or ridden alone.  

Loop 3 can be accessed from the Loop 2 trailhead or by an access point just north of the Township Hall parking lot on Clark Road. Over 1.6 miles in length, it features flowy downhills, berms, rock features and tight twisty uphills. Very different from the open woods of Loop 1 and the meadows of Loop 2, Loop 3 is thick with vegetation. This loop is marked with gold arrows.

Park contains bathrooms with flush toilets, a pavilion and a playground, as well as paved biking path that connects the Township Hall to Meijer and Hartland High School. Ample parking available just north of township hall and at the Meijer lot.  Both loops are frequented by hikers and trail runners, so please yield.   

Trail Status: open

Trail Miles: 6.5

Entry Fees: None

Trail Conditions and Discussion Forum: Link

Trail Coordinators: Tom Hermann, Marc Cope

Trail Maps: JPG, GPX (Click 3 dots, select Download)

 

Find this trail on MTB Project

 


  • Seize the Snow

    Seize the Snow

    Fat Bike, Mountain Bike, … Just go ride! Need help getting started? There’s a lot of great advice on clothing, tires, and other winter riding topics in the MMBA Tips and Techniques forum.  

  • See you at the Expo!

    See you at the Expo!

    Sunday, Jan 27th Michigan State University Pavilion 4301 Farm Lane, East Lansing, MI  48824 This year’s Expo will feature: Indoor riding arena Championship Points Series (CPS) awards Raffle Swap meet MMBA Annual Meeting Concession stand serviced by MSU 8 a.m.  Setup 8 a.m.  Mountain Bike Patrol meeting 9 a.m.  Expo opens for swap meet, vendors,…

  • Michigan Comprehensive Trails Plan – Call to Action!

    Michigan Comprehensive Trails Plan – Call to Action!

    The DNR has announced that a draft of the new Michigan Comprehensive Trails Plan is available online for public review and comment. Read the draft at: http://www.michigan.gov/documents/dnr/draft_mi_trail_plan_12-2012_406477_7.pdf and submit comments using the survey at: http://www.surveymonkey.com/s/7YM69D2 This plan is 140 pages in length, but the MTB trail-specific content begins at page 97 and ends at page…